You or your institution have access to this content DISCUSSION. THE ELECTRIFICATION OF THE MADRAS SUBURBAN SECTION OF THE SOUTH INDIAN RAILWAY.

  • Authors: B G WHITE; SIR C HINDLEY; S B DONKIN; R T SMITH; H N GRESLEY; J M KENNEDY; L H SHORT; W S GRAFF BAKER; H NIMMO; J A BROUGHALL
  • Source: Minutes of the Proceedings, Volume 234, Issue 1932, pages 260 –275 , , E-ISSN: 1753-7843
  • PDF PDF
    1,018.01K

260 DISCUSSION ON THE ELECTRIFICATION OF THE [Minutes of Discussion. The Author. Sir Clement Hindley. The AUTHOR, exhibiting a number of lantern slides, remarked in that the mostinteresting feature of the overhead equipment was perhaps the form of mast used, which consisted of a G-inch by 6-inch joist, slit in the web, and expanded to give the necessary greater width at the base. On to these masts all t'he t,op equipment was clipped, and the wholewas capable of being adjusted in position. That arrangement obviated drilling, which had objections, and assisted greatly in the erection, besides reducing the cost...

Share this article with others: These icons link to social bookmarking sites where readers can share and discover new web pages.