Llangollen Railway: refurbishment of Berwyn Viaduct
This paper sets out the key aspects of the planning, design and construction phases of the refurbishment of Berwyn Viaduct at Llangollen Railway, together with details of the construction of the replica cantilever platform to replace the structure removed following the Beeching cuts in the 1960s. It details how close liaison was required between the client and contractor to ensure the successful conclusion of the project on time and within budget.
Share this article with others:
These icons link to social bookmarking sites where readers can share and discover new web pages.
Home Page










